| US$25,000.00-35,000.00 | 1 Piece (MOQ) |
Product Name | Taizhou Professional Making Plastic RO Water Purifier MOLD |
Product material | pp/pc |
Core&Cavity Steel | 718 |
Steel hardness | HRC35-38 |
Mould Standard | DME |
Cavity Number | 1 |
Injection System | side gate |
Ejector System | ejector pin |
Cycle Time | 30 s |
Tooling lead time | 60 days |
Mould life | 500,000 |
Quality assurance | ISO9001 |
Our Advantage | 1.High quality |
2.Reasonable price | |
3.On time delivery | |
4.Good After-sale service | |
5.Strict quality control | |
6.All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. | |
For more information please contact us. | |
| Processing | Time |
| Prepare Steel | 5 days |
| CNC Machining | 10 days |
| Drill | 8 days |
| Heat treatment | 6 days |
| High speed CNC Machining | 7 days |
| Assembling and Fitting | 6 days |
| Polishing | 6 days |
| T1 mould test | 2 days |
| 1.Samples/Drawing &Requirement from you | |
| 2.Mould design:we will Communicate&Exchange the opinion with you after you place order. | |
| 3.Material Purchase:Steel cutting and Mould base tooling. | |
| 4.Assembling. | |
| 5.Inspection of mould : following and controlling the tooling processing. | |
| 6.Mould testing:We will inform you the date.Then will send the sample's inspection report&injection parameters with the sample to you! | |
| 7.Your instruction &confirmation for shipment. | |
| 8.Ready made mould before packing. |