Product Description
Product Description
Product Description
AT292 Series HTHP Jet Hank yarn Dyeing Machine is suitable for bleaching, refining, dyeing, washing and post-treatment of hank yarn of polyester fiber, rust thread, silk and nylon yarns.
Specification
Model
| AT292-2
| AT292-5
| AT292-10
|
Capacity
| 2kg
| 5kg
| 10kg
|
Designed Pressure
| 0.44Mpa
|
|
|
Max work Pressure
| 0.40Mpa
|
|
|
Designed Temperature
| 140ºC
|
|
|
Max work Temperature
| 135ºC
|
|
|
Heating rate
| 5℃/min
|
|
|
Cooling rate
| 4℃/min
|
|
|
Liquor Ratio
| 1:6~1:20
|
|
|
Power
| 1.1KW
| 1.5 KW
| 5KW
|
Dimension(mm)
| 1500×1210×1700
| 1700×1350×1900
| 2000×2400×1700
|
Details
Air pressurizing typeBath ratio is adjusted according to the variety of yarn and dyeing process, or it can be selected by adjusting dyeing bath volume according to case may be. Greatly saving the energy source, water, steam. Full filling typeThis machine has chemical material system(mixer and chemical material barrel), pressurizing and material loading system(auxiliary pump), internal and external dyeing liquor circulation system(cooler). During dyeing process the fabric processing requirements can be met under room temperature and high pressure and high temperature and high pressure featuring wide application and good dyeing chrome and luminosity.
Dyeing machine automationThis machine is of automation to various extent to meet various requirement, with the automation. Range from simple control of temperature rising and lowering according to operator's clew to automatic control over loading vessel and dosage system operation with exception of yam inlet. Outlet and sampling dyeing vat.
Safety and convenienceThis machine uses self-sealing of pot rim. Combination safety device of pneumatic pot rim locking and pneumatic pot cover opening and closing device, being of easy and reliable operation.
Details & Features
★ This machine adopts a special design of low energy consumption, low head, large flow mixed-flow pump. High temperature does not affect its characteristics at all.
★ New weir jet tube, dyeing tube and yarn-turning shifting tube are integrated. There is absolutely no winding or knotting of the dyed yarn. After dyeing, the drum is easily inverted and the loss rate is low.
★ Special designed water regulator can adjust the amount of water arbitrarily according to the amount of dyed yarn and yarn count and variety. The machine has been optimized in structure, small bath ratio, saving raw materials and low cost.
★ The fuselage material is made of high quality and corrosion resistant stainless steel.
★ The jet tube is made of SUS-316L stainless steel plate with high corrosion resistance.
★ High performance stainless steel mixed flow pump.
★ Equipped with auxiliary cylinder, it has the functions of stirring heating, feeding water, reflux and feeding.
★ Reliable PLC program controller.
★ Automatic water level indicator.
★ Design of Safe Operating System
★ Tools for easy yarn loading, yarn discharge and nozzle cleaning
★ This machine are equipped with automatic water supplying system to save labor.
Our Company
History
Since 1982 with more than 20 years’ experience
Warranty
Two Year Warranty for whole product
Training
Video and user manual for training
Onsite service
Installation and training service is available
Testing service
Free sample testing before order is available
Lead time
15 working days lead time for most product
Packing & Delivery
Packaging
|
|
Dimensions
| 1160x510x1050mm
|
Weight
| Approx. 80kg
|
Packaging Details
| 1. The equipment is covered with film is protect it from water vapour during the trip. 2. The box is filled with foam to protect the equipment from impact. 3. Exported wooden box made from plywood, don't need fumigated.
|
Payment
Payment Term
| T/T
| EXW
| 30% T/T in advance, paid the balance before shipment
|
|
| FOB
|
|
|
| CFR(C&F)
| 30% T/T in advance, paid the balance against copy of B/L
|
|
| CIF
|
|
| L/C
| L/C amount above 50,000 usd, we can accept L/C at sight
|
|
| West Union
| Amount lower than 5000usd
|
|
| West Union
|
|
|
Delivery Time
| 7~10days after receiving payment for one container
|
|
|
Contacting Us