US$38.00
50-199 Square Meters
US$32.00
200-499 Square Meters
US$27.00
500+ Square Meters
Basic Info.
Usage
Party, Traditional, Beach Tent, Exhibition Tent
Pole Material
Aluminum Alloy
Product Name
Storage Warehouse Tent
Frame Material
High Reinforced Aluminum Alloy
Fabric Material
Double PVC-Coated Polyester
Fabric Features
Flame Retardant, UV Resistance, Waterproof
Connection Part
All Steel Parts Are Galvanized Steel, Hot-Dipped
Occasion
Outdoor Party, Event, Exhibition etc
Temperature Rate
-30 to +70 Temperature
Maximum Wind Limit
80~100km/H
Transport Package
Packed in PVC Bags and PP
Specification
PVC fabric and Aluminum alloy
Product Description
Outdoor Aluminum Structure Warehouse Storage Industrial Large Tent Product Description
Span Width | Bay Distance | Side Height | Ridge Height | Roof Pitc | Aluminium Profile |
12m/39.4' | 5m | 3m | 5.2m | 20° | 122x68x3mm |
15m/49.2' | 5m | 4m | 6.4m | 18° | 166x87x3mm |
18m/59' | 5m | 4m | 6.9m | 18° | 204x110x4mm |
20m/65.6' | 5m | 4m | 7.2m | 18° | 204x110x4mm |
25m/82' | 5m | 4m | 8m | 18° | 204x110x4mm |
30m/98.4' | 5m | 4m | 8.9m | 18° | 256x111x5mm |
35m/114.8' | 5m | 4m | 9.8m | 18° | 300x125x8mm |
35m/114.8' | 5m | 4m | 10.6m | 18° | 300x125x8mm |
45m/147.6' | 5m | 4m | 11.4m | 18° | 300x125x8mm |
50m/164' | 5m | 4m | 12.3m | 18° | 350x125x8mm |
Welcome to contact the manufacturer to get the latest tent's information |
The installation of PVC top cover and side walls
Relative products Company Profile
FAQ Q1. What is the Life Span?
The lifespan of the aluminum frame can reach 15-20 years, and 5-8 years for PVC fabrics depending on weather conditions of different countries.
Q2. Is it Easy to install and dismantle ?
Yes, it can be used as both permanent and temporary structures. Easy to install, dismantle and transport.
Q3. What is the requirement to the ground foundation.
Our tent structure can install on concrete ground, grassland, or sand ground in the desert. If install in grassland or sand ground, you will need to request anchor from our sales.
Q4. What is the payment term?
30% deposit to start production, balance after goods ready before shipping.
Q5. What is your production time?
We will finish production within 15 to 25 days after deposit.
Q6. Are you a direct factory?
Yes, we are a direct factory. Our factory is located in Shenzhen City, China.