Basic Info.
Application
Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery
Use for
Electrical Contact
Transport Package
Plastic Bag,Carton, or as Per Customer Requirement
Production Capacity
100000pieces/Year
Packaging & Delivery
Package Size
30.00cm * 20.00cm * 20.00cm
Package Gross Weight
5.000kg
Product Description
Product Description
| Product Name | Metal Processing Machinery Parts CNC Service |
| Product Dimension | Various shapes are available |
| Product Shape | Various shapes are available |
| Processing Type | Stamping |
| Tolerance | ±0.02mm or as per customers' requirement. |
| Material Standard: | ISO, DIN, ASTM, UNS, AISI, JIS, BS, NF |
| Materials available | Stainless Steel, Carbon Steel, Steel, Copper, Brass, Aluminum, Silver, Gold, Chrome, Tin, Nickel, Zinc, Alloy etc. are available. |
| Material Thickness | As per customers' requirement. |
| Surface Treatment/Finish | Anodize, Chromate, Electrolytic Plating, Nickel Plating, Galvanize, Tempered, Paint, Powder Coating, Polish etc., |
| Heat treatment capability | Annealing, Normalizing , Nitriding, Tempering ,Carbonitriding, Carburizing and induction hardening etc., |
| Industry Of Use | Electrical |
| Quality Assurance | GB/T19001-2016 ISO 9001:2015, GB/T240001-2016 ISO 14001:2015, RoHS |
| Sample Lead-time | Within 1day for samples available from our stock About 1-2weeks for custom samples |
| Mass Production Lead-time | 3-7 weeks after receiving deposit. |
| Price Terms: | EXW/FOB/CFR/CIF SHENZHAN or any other airport or seaport, China |
| Payment Terms | 30% deposit, balance against B/L copy |
| Modification | Mould modification until the customers satisfy it. |
| Inspection | In-house or third party, all the products are strictly inspected by skilled QC |
| Design: | We use the most advanced mould design software Auto CAD, Pro/E, Solidworks, UG (dwg, dxf, IGS, STP, X-T) |
| Country of Origin | China (mainland) |
| Main Export Markets | Europe, America, Mid East, Asia, Africa etc., |
| Service Type: | OEM & ODM |
| Business Type: | Manufacturer, Exportor |
| Advantages | Expert in producing OEM parts: metal stamped, machined, deep drawn and sheet metal formed parts with various finishing Our factory is located in Dongguan, nearby Guangzhou and Shenzhen ports, which can save transportation time and cost Employing reliable rockers and utilizing advanced machines: we have a full range of machinery and equipment for punching, welding, CNC, milling and grinding. We also have experienced technicist who are engaged in technical development. Our skilled workers, professional engineers, R and D center and excellent foreign trade team always keep the passion to support our customers |
At Dongguan Sun Hua Plastic Metal Ltd, we excel in the art of crafting precision-engineered molds. Our forte lies in the sophisticated design and meticulous fabrication of plastic injection molds, die-casting molds, and rubber molds.We offer a comprehensive mass production service, tailored to accommodate the diverse demands of your production requirements. Our pricing is flexible, adapting to the volume of your order. Don't hesitate to send us your specifications.
1. Automotive Sector
2. Powered Tools Industry
3. Home Appliance
4. Medical Industry
5. New Energy Application
Tooling Specifications and Requirement
| Tool Life Cycles | Extremely High Volume | High Volume | Low Volume |
| 2D Design Drawings | | | |
| 3D Design Drawings | | | |
| Component ID | | | |
| Tool Steel ID | | | |
| Cycle Counter | | | |
| Spare Ware Parts | | | |
| Spare Parts List | | | |
| Fully Automatic Operation | | | |
| DFM Report | Shall be completed and approved before mold build. All part model changes shall be approved. Report include: KO locations, gate locations, parting line, split lines, mold flow analysis (when required), cosmetic issues, dimensional issues. |
| Cpk Requirement | Required Cpk requirement for critical dimensions. |
| Cycle Time Target | Mold cycle time shall meet or exceed targets while producing parts within the Cpk requirements. |
| Critical Dimensions | Percentage of print tolerance to nominal, mold cavity dimensions of critical dimensions shall be held within. |
| Minor Dimensions | Percentage of print tolerance to nominal, mold cavity dimensions of critical dimensions shall be held within. |
| Self Lubricating Hardware | Hardware that sees movement should be self lubricating per hardware requirements. |
| Certified Tool Steel | Tool steel shall be certified from steel provider. |
| Mold Flow Analysis | (when required) |
| Mold Dimensional Study | |
| Part Dimensional Study | |
Inquiry basic information:
Provide us with the part's 2D drawing, 3D file, or a sample picture with detailed measurements (3D files in IGS, STP format, etc.):
Tooling steel:
Is a standard mold base required or not:
Specify your runner system preference (Cold or Hot):
Mold cavity: We offer multi-cavity tools with shut-off gating designs for each individual cavity.
Delivery address:
The Strength of SUN HUA:
1. Mastery in die casting tool creation.
2. Comprehensive, integrated solutions for die-casting parts, plastic injection parts, and toolings.
3. Exceptional efficiency in both time and cost, ensuring value for investment.
4. Robust project management coupled with prompt, efficient delivery.
Tooling Making
Company Profile
Strength:
1. With a storied history dating back to 1997, we have firmly established ourselves as a distinguished die caster, specializing in the full spectrum of OEM die casting parts production. From the initial stages of model designing and prototype creation to tooling development and large-scale manufacturing, we have consistently delivered excellence.
2. Proudly partnering with top-tier brands, including esteemed names like BOSCH, TTI, and BYD, our collaborations speak volumes of our unwavering commitment to quality and innovation.
3. Our state-of-the-art equipment inventory features cutting-edge CNC machines, EDM, and grinding machines, alongside die casting machines ranging from a robust 88 tons to a formidable 2500 tons, ensuring unparalleled technical precision and capability.
4. We offer comprehensive and tailored solutions for your products, assuring you of the most competitive pricing in the industry without compromising on quality.
Expertised Tooling Making
6. As-cast Quality Control
7. Precision CNC machining
8. Measurement Correlation
9. Production Planning and Management
10. Project Management and Scheduled Delivery
11. Our commitment extends beyond production, offering exemplary after-sale service to address any quality concerns, ensuring complete customer satisfaction.
Qualification and Honor
FAQ
Q1. Are you a factory or trade company?
We are a state-of-the-art manufacturing facility strategically located in
No. 86-88, Hongying Industrial Zone, Hongshi Bridge, Fenggang Town, Dongguan City,
Guangdong Province, China, ensuring precision and efficiency in our processes.
Q2. What kind of production service do you provide?
Our services are comprehensive and include mold making, die casting, CNC machining, stamping, plastic injection, assembly, and surface treatment.
Q3. How about the lead time?
For molds, anticipate a lead time of 3-5 weeks.
For mass production, expect a swift 3-4 weeks turnaround.
Q4. How about your quality?
♦ We proudly hold ISO9001:2015 and IATF16949:2016 certifications, a testament to our unwavering quality standards.
♦ Operational instructions are meticulously crafted upon sample approval.
♦ Each product undergoes a 100% inspection prior to dispatch, ensuring excellence.
Q5. How long should we take for a quotation?
Once we receive your detailed 2D/3D drawings or samples, expect a precise quotation within 2 days.
Q6. What is your quotation element?
Our quotations consider Drawings or Samples, Material, Finish, and Quantity.
Q7. What is your payment term?
For molds, we require 50% upfront, with the balance due upon sample approval.
For goods, a 50% prepayment is needed, with the remaining balance due via T/T before shipment.