Product Details
Product Description
Product Description
Focus on DCS, PLC, robot control system and large servo system.
Main products: various modules / cards, controllers, touch screens, servo drivers.
Advantages: supply of imported original products, professional production parts,
Fast delivery, accurate delivery time,
The main brands include ABB Bailey, Ge / fuanc, Foxboro, Invensys Triconex, Bently, A-B Rockwell, Emerson, ovation, Motorola, xyvom, Honeywell, Rexroth, KUKA, Ni, Deif, Yokogawa, Woodward, Ryan, Schneider, Yaskawa, Moog, prosoft and other brands
TrustedTM System Mechanical Build This application note explains the mechanical fitting of the TrustedTM chassis and accessories into a 19” rack. This includes mounting details for: T8100 Processor Chassis T8300 Expander Chassis T8270 Fan Tray Rack Mounted T824x Power Shelves T8292 MCB Power Distribution Unit T8290/T8297 Output Power Distribution Unit Issue Record Issue Number Date Revised by Technical Check Authorised by Modification 1 Feb 07 Nick Owens Ray Brown Pete Stock Initial Issue TrustedTM AN-T80003 TrustedTM System Mechanical Build Issue 1 Feb 07 AN-T80003 2 Mechanical Assembly The following steps defines a recommended procedure for fitting TrustedTM chassis and accessories into a 19” rack. 1. Mount the TrustedTM Power Supply (T8240) into the swingframe as required. The T8240 Power Shelves require T8247 support brackets to be fitted first and secured by fitting the first power shelf with M5 x 12 Pan Head Taptite screws and large plain and crinkle washers through the support brackets. The power shelf must then be secured to the support bracket using four M3 x 6 slotted cheesehead screws or similar with a plain washer. 2. Mount the TrustedTM Controller and Expander Chassis into the swingframe as required. 2U of rack height above and below each controller and expander chassis must be provided to allow the installation of fan trays and vents. The chassis are secured in position using M5 x 12 Pan Head Taptite screws and large plain and crinkle washers through the inner pair of holes on each chassis mounting flange. 3. Mount a TrustedTM Fan Tray Unit above each chassis. Fixings are through the fan tray grille and ears using 4-off M5 x Pan Head 12 Taptite screws, crinkle and M5 plastic cup washers. Fan tray units must be fitted AFTER the module chassis to avoid fouling of the chassis power connector. 4. Check the alignment of the chassis and fan tray units on the front of the swingframe. 5. Fit plastic facia ears over the mounting ears of each module chassis. Fixings are M5 x 12 Pan Head Taptite screws and crinkle washers. 6. Fit blanking plates to mask off unused rack space.