Fiber Laser Cutting Machine

Fiber Laser Cutting Machine

US$10,000.00 1 Set (MOQ)

Basic Info.

Model NO.
SG-6025
Technical Class
Continuous Wave Laser
Applicable Material
Metal
Structure Type
Gantry Type
Laser Classification
Gaseous Laser
Laser Technology
Laser Flame Cutting
Laser Head
Wsx, Raytools, Precitec, Lt etc
Laser Source
Jpt, Raycus, Ipg, Max, Feibo, Gw, Reci, Trumpf
Proportion Valves
Japan SMC
Reducer Motor
Japan Shimpo, France Motovario
5 Axis Bevel Cut
Customized Support Only for 15000W Above
Control System
Fscut 2000, 3000s, 8000 Optional
Computer Set
Industrial Control Standard or Leveno
Servo Drive Motor
Japan Panasonic, FUJI, Yaskawa
Exchange Table
Optional
Protection Cover
Optional
Chiller Machine
S&a, Hanli, Dongluyang
Oil Lubrication
Automatic
Transport Package
Plastic Film
Specification
1500x3000mm can accept for customized
Trademark
SINOMEC
Origin
China
HS Code
8486402900
Production Capacity
200sets/Each Month

Product Description


The Menchanical Structure is Gantry Type , With Stable Performance and stable equipment Operation .
Professional CNC Control System ,With Laser Power Regulation Function ,Which can ensure cutting quality.
Simple and Convenient Operation ;
The Machine adopts AC servo motor drive system ,gear and rack double drive to ensure the high speed ,high precision and high reliability of the equipment .
The Air circuit system adopts Integrated Control ,Adavanced design ,full set of pneumatic components imported ,and can be connected with different auxiliary gases at same time , Customers can freely choose gas according to the actual situations .
High Quality and High Effciency fiber laser generator, low processing cost ,energy saving ,enviromental Protection .
Whole Set Fiber Laser Cutting Machine System All Configurations Details
Model Item Name Qty Remark
SG3015 Middle Grade Power Machine Bed 1 set Sinomec
3000w,6000W 8000W Laser Source 1 Set RAYCUS,MAX,RECI,IPG
BM series Automatic Focusing Cutting Head 1 set Raytools Cutting Head
X Y Axis Gear and Rack(Dual Drive) Transmission Parts 3 sets Taiwan KH or YYC
Reducer Transmission Parts 3 sets Japan Shimpo
Linear rail Transmission Parts 3 sets Taiwan Hiwin
Laser Control System CNC system 1 set FSCUT 2000
AC servo system CNC System 4 sets Japan Panasonic
Oil Lubrication Auto Made In China
Chiller Machine Double Temperature Dual Control Auto Dong Lu Yang or Wuhan HanLi
X axis motor and driver Japan Panasonic Imported
Y axis motor and driver Japan Panasonic Imported
Z axis motor and driver Japan Panasonic Imported
Proportion Valves 1set Japan SMC
Exhaust Fan System Made In Sinomec
Computer 1 set Made In China
Iron Pad SINOMEC
Pickup Trolley Tray SINOMEC
Packing Mode Plastic Film Then Pack into Container then for fixed
Training & Installation Laser Machine Training&Installation:
1) Visa will depending on payment by customer
2) Round trip tickets payment by customer
3) Room and board payment by customer
4) 100USD/day -Service Fee for Sinomec Engineer

Sinomec Laser Machine Structure Layout design as below :
Laser Cutting Samples as under :
SINOMEC LASER EQUIPMENT MORE DETAILS
SINOMEC LASER CONTROL SYSTEM :
CYPCUT is a widely used and stable system, equipped with full sets of height
controller, to achieve numerical control project to make sure the completeness of
the core system, ensures the long-term stability of laser cutting
Equipped with full function and easy-to operate cypcut laser cutting software
Easy operation : Whether you have or not have experience in laser
equipment operation, you can master the use of cutting software quickly through 1-
2 days of training;
Graphic form rendering processing view: whether it is importing graphics
or NC processing code, it is finally formed in graphics in software, graphics
processing, process editing modification, machining process simulation
operation, etc., all of which are visualized and intuitive;
Powerful, professional and practical functions: The software have drawing
function, to meet the needs of conventional graphics drawing and direct
processing; complete process settings, frog jump, flight cutting, cutting gap
compensation, automatic edge finding, film cutting, marking, etc. It can fully
meet the basic requirements and special process requirements of laser cutting
process in different processing industries with different powers and different
configurations;
Continuous updates and free software upgrades;
The cutting application and the nesting are combined into one.
The software has nesting function, which can directly input and process the work
piece pattern for nesting typesetting, and directly cut the processing result of the
typesetting, avoiding the cumbersome process of introducing the additional
nesting material into the cutting software, improving the efficiency of
pre-processing preparation, and also Customers save on the cost of additional
purchases of nesting software

After sales Service : a, the company is always responsible for guiding the installation and commissioning of equipment. b, after the signing of the contract, my company in the shortest time to understand your company's plant installation location, to determine the specific installation location of equipment. and provide the equipment base map within 7 business days of
the contract's entry into force. c, before the deployment of commissioning, your company should be based on the basic drawings of equipment provided by our company to do a good job of equipment foundation, to ensure that the installation site is equipped to meet the
equipment installation requirements. d, your company in the completion of the equipment foundation construction, the goods arrived at the demand side of the delivery site, our personnel will bring their own necessary tools for the installation and commissioning of equipment,
and within 15 days responsible for completing the installation of equipment, commissioning, technical indicators testing,
testing, training, acceptance and delivery to users. e, the contract provides all the equipment by our company is responsible for the installation and commissioning. After the installation and commissioning of the equipment, our company first self-test of the equipment and the technical
indicators to meet the technical requirements of the contract, the supply and demand of both sides of the equipment
acceptance and use. f, in the installation and commissioning process of our company's technical staff will explain the installation steps of the equipment and should pay attention to the matter, the installation of each piece of equipment should be detailed
installation records. All equipment damage caused during installation, the responsibility is in our company. Second, packaging transport a, mode of transport: car transport, by our company is responsible for all responsibilities. B. The place of delivery is the installation site your company needs. Third, equipment acceptance a, acceptance criteria Acceptance of the technical agreement in the contract signed between our company and your company. b, final acceptance My company completed the installation of equipment, commissioning and self-inspection, in the demand side site acceptance, content package Enclosed: 1) The quantity, model specification, function, technical indicators, etc. of all goods are inspected and accepted. 2) Laser cutting and processing of typical samples approved by both parties. 3) Both parties do a good job of acceptance of the record, and the acceptance results to give an evaluation, by the two sides signed and approved before the performance assessment. c, other instructions for final acceptance 1) If the site auxiliary facilities failure (power supply, surrounding environment, etc.) and the environment does not meet the requirements of normal operation of the equipment caused by the interruption of test acceptance, the need side should immediately repair, to ensure that the equipment normal working conditions. 2) In the acceptance process, if found that the equipment is in short supply, damage or non-compliance with the terms of the contract and quality standards, my company will be responsible for the replacement, which causes all costs to be borne by our company. 3) The shelf life of the equipment shall be calculated for one year from the date of acceptance. Training The company provides free technical training, installation and commissioning, in your company or our company's domestic training and maintenance center for your company operators for not less than 5 days of technical training, until the operator scored basic normal use of the equipment, the main training content is as follows: The basic knowledge and principle of laser; The construction, operation, maintenance and maintenance of the laser; Electrical principle, numerical control system operation, programming and general fault diagnosis; Machine operation and daily maintenance; Business Quotes V. After-sales service 1, after the acceptance of equipment, the whole machine quality assurance period of one year, laser source warranty 2 years. 2, if the quality of the system parts during the shelf life quality problems, our company's well-trained service engineers will be ready to provide telephone or on-site service. 3, the equipment warranty period, due to the quality of the equipment itself caused by any damage or damage, our company is responsible for free replacement parts and services, but conventional consumables
(such as optical lenses, cutting nozzles, ceramic rings) and belong to the user's illegal operation of liability accidents except. 4, our company to provide products to provide life-long maintenance services, and at any time to provide equipment-related daily advice and guidance. In addition to the warranty period, our company still for the need to provide a wide range of preferential technical support and spare parts supply. 5, my company free of charge for customers long-term reserves through our company's strict training, high-quality operation and maintenance technical personnel, always ready to serve customers. Solve the customer's troubles in finding a technician. 6, after the equipment factory, our company set up a "user file card" to track the user to use the device information. After the completion of equipment repair services, our company will report the cause of the failure, remedial measures, repair and return to normal time and date to the needy side, report two copies, for inspection. 7, my company is committed to timely notification of software upgrades to the demand side, and provide free software upgrade services. 8, our company has sufficient spare parts, accessories, can be timely to provide technical services and spare parts services to meet the needs of equipment maintenance. 9, my company regularly arranges project engineers to the user site for free technical return visit services.

>> Polyester Fabric China Supplier Wipes Raw Material Free Sample Spunlace Nonwoven
>> Handheld NFC Reader Industrial 1d 2D Qr Code Desktop Barcode Scanner Android Tablet Rugged PDA Mobiles C6300
>> Hydraulic Port Crane Grab Lifter Grab Bucket GB002
>> Stainless Steel Process Double Ended Bolt PFTE Coating ASTM A193 B8
>> Factory Direct Sale 24 Inch 1K 2K Gaming Monitor, Office Monitor
>> Heavy Duty Industrial Metal Drilling Machine for Precision Tasks
>> 3.0 Easy Drive Cable USB 3.0 SATA Data Cable for CD-ROM PC SSD Mobile Hard Disk
>> Oval Modern Luxury Ceramic Face Hand Wash Basin Bowl Bathroom Vanity Vessel Sink for Hotel
>> Automatic Glove Machine Glove Dipping Machine
>> Metal Scrap Recycling Machine Crusher Machine Dual Shafts Shredder
>> Color Printed Coated Chromized and DOS Treated Aluminium Sheet for Cosmetics Cap
>> CS6266 Conventional Manual Lathe Machinery (Metal Lathe Machine)
>> Foot Operated Guillotine Machine From Anhui Yawei with Ahyw Logo for Metal Sheet Cutting
>> Wholesale Small Digger Machinery 1.2 Ton Mini Excavator with Cheap Price CE/EPA
>> Hot Selling X Ray Room Lead Ingot 99.99% Xray Sheet /2mm 3mm Lead Sheet Plate for Battery with 2mmpb / 2mm Lead Sheet for Radiation Protection/Roll of Lead Shee
>> Horizontal Ribbon Salt Sugar Pepper Food Powder Stirring Mixer
>> High Strength Ud PARA Aramid Fiber Fabric Bulletproof Fabric
>> Professional Riding Breeches Soft Shell Breeches Full Seat Knee Grip Riding Pants Riding Pants Horse Womens Riding Leggings
>> Stainless Sheet Metal Bending Folding Machine Wc67K 40/1600 CNC Hydraulic Press Brake Machine with Tp10s
>> New 7/10 Heads Hifu Professional Rejuvenation Anti Aging Wrinkle Beauty Machine RF Ultras
>> Mower Wheel Mower Accessories Straight Blade Slash Blade Loosening Wheel Universal Weeder Wheel Deep Tillage Wheel 26mm
>> Casual and gym wear ladies top selling High Ranked custom zipper up cropped top hoodie
>> Taijia wholesale rebound hammer test / esclerometro / sclerometer concrete
>> NDZ3X-35010 High Voltage DC contactor for Electric vehicle 1000V 350A FOR EV Charging station
>> High Quality Car Streamer Threshold Bar For Alphard 2002 - 2015
>> 107-1306100-04 For Lada parts car engine thermostat 107-1306100-04
>> High Quality Aluminum Post Sign Mounting Brackets
>> Olive Oil Glass Bottle in Stock Green, Dark Green, Brown, Round, Square Shape FDA, EEC, LFGB Certificated
>> Polyurethane Foam Sealing Gasket Machine
>> Precision Injection Molding Solutions for Quality Plastic Parts
Product