US$10,000.00-15,000.00
|
1 Set
(MOQ)
|
Basic Info.
Surface Finish Process
Polishing
Mould Cavity
Single Cavity
Process Combination Type
Single-Process Mode
After-sales Service
One Year
Mould Runner System
Hot Runner/Cold Runner
Mould Design Software
Ug, Proe, Solidworks CAD, etc
Mould Quality Control
Professional QC
Mould Operating Mode
Automatically by CNC
Mould Standard
Dme,Lkm,Hasco
Offer You
OEM&ODM Service
Mould Wate Cooling
by Experienced Designer
T1 Sample Time
45-60 Days
Mould Water Cooling
by Experienced Designer
Transport Package
High Quality Wooden Case
Specification
DME, HASCO, LKM, etc
Origin
Huangyan, Taizhou, China
Production Capacity
300sets/Year
Product Description
Product Name | Quality Injection Plastic Grass Paver Grid Mould |
Product material | PP |
Core& Cavity Steel | 2738, etc |
Steel hardness: | HRC35-38 |
Mould Standard | DME, HASCO, etc |
Cavity Number | single |
Injection System | Direct Gate |
Ejector System | Ejector Pin |
Cycle Time | 50S |
Tooling lead time | 60DAYS |
Mould life | 1, 000, 000SHOTS |
Quality assurance | ISO9001 |
Specification | According to client' s requirements |
| |
Our Advantage | 1. High quality |
2. Reasonable price |
3. On time delivery |
4. Good After-sale service |
5. Strict quality control |
6. All the mould are automotic. |
| |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs |
In-time communication on the technical points |
In-time sending pictures for the mould machining progress and mould finishing schedule |
In-time mould test and sample delivery |
In-time mould delivery. |
car dashboard mould |
1. Samples/Drawing & Requirement from you |
2. Mould design: we will Communicate& Exchange the opinion with you after you place order. |
3. Material Purchase: Steel cutting and Mould base tooling. |
4. Assembling. |
5. Inspection of mould: following and controlling the tooling processing. |
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! |
7. Your instruction & confirmation for shipment. |
8. Ready made mould before packing. |
| |
For more information please contact us. |
Main QC Procedure
mould design control
mould steel certificated
mould steel hardness inspection
mould steel electrodes inspection
mould core and cavity steel dimension inspeciton
mould pre assembly inspection
mould trial report and sample inspection
mould pre shipment trial inspection
export mould package inspection.
FAQ:
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.
2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.
3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.
4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.