US$1,200.00-1,400.00
|
19 Pieces
(MOQ)
|
Basic Info.
Transport Package
Wooden Crate Packaging
Specification
126*59*126CM
Packaging & Delivery
Package Size
50.00cm * 60.00cm * 100.00cm
Package Gross Weight
60.000kg
Product Description
Supplier's product description
Product Description industrial hat cap ironing machine mould single/double head customizable automatic cap making machines
Hat ironing is an important process in hat production. Our hat ironing machine has a built-in steam boiler, the steam generated makes the hat ironing and shaping. In addition, it is equipped with automatic water system and water shortage alarm system, which improves the work efficiency and safety..
Features:1) this machine can match cooling device at rear side of the machine. 2) Water, steam time, drying time and all the function can be controlled as programmed. 3) Generator inside, adding water automatically.good for mass-production. 4) We can supply machines that is attached 1 mould, 2 mould etc according to optional items of Consum Technical parameters
Product | Hot sale automatic steam baseball cap ironing machine with single head |
Electrical Spec | 220V 50/60HZ |
Dimension | 750*680*1300mm |
Gross Weight | 98kg |
Application | automatic steam cap ironing machine |
Power Consumption | 6 kw |
Air Pressure | 4-6 kg/cm2 |
Packing | Plywood case with steel pallet |
Specification
1 | Model | N6 |
2 | Supply voltage: | 220V |
3 | Machine weight: | 68kg |
4 | Rated frequency: | 50 Hz |
5 | Equipment volume: | 3A |
6 | Dimensions (length*width*height): | 120*55*123mm |
Shoe washing machine
Installation location requirements:1,
1. There are fled water supply and drainage pipelines, and it is confirmed that the watersupply and drainage are uno bstructed.
2. There ls a fixed power supply with leakage protection and good grounding, with a powersupply voltage of 220v, and a 10A dedicated socket installed.
3. The installatio n site has a flat and sturdy ground, and the enronment is easyto operate
4,Installation steps:
5. flrst, install the shoe washing machine in a locatlon that meets the requlrements of (firstitem).
6 Connect the watersupply and drainage pipes to the fibxed pipe openings2.3. Connect the power cord plug to a 10A dedicated socket
7. Check whether the machine installation ls smooth, whether the water plpe joints, powersupply terminals are secure, and whether the grounding is good.
Packaging and delivery Company Profile
FAQ
Q: How to get samples? How much is the sample fee? How long will it take?
Answer: Please confirm with us the model you want to purchase and prepay the sample fee. After the sample test is qualified, we will refund this sample fee when you order in bulk. We can send out samples within 2 working days after receiving payment.
Q: Delivery and payment term?
A: Most of our products are available in large quantities in stores and we will send them out as soon as we receive your payment.
For special needs, it takes about 15-20 working days to manufacture it.
Payment terms: EXW, FOB, CIF, C&F, etc. 30% T/T deposit, 70% balance before shipment.
Q: Shipping?
A: If your order is not big enough, door-to-door service via UPS, FEDEX, DHL, EMS is the best choice.
For bulk transportation, air or sea shipping through your freight forwarder is a normal way, we can also provide cost-effective freight forwarders for your reference.
Q: Advantages?
answer: 1) We produce parts ourselves, with more competitive prices and faster delivery;
2) We provide OEM services and submit various styles, latest designs to customers;
3) We have rich experience in providing high-quality services to customers experience.