US$15,000.00-16,000.00
|
1 Set
(MOQ)
|
Basic Info.
Automatic Grade
Automatic
Certificate
ISO9001:2000/CE
Advantage
Simple Structure
Material Grade
Q215,Q235,Q345,Q550
Material Thickness
0.8mm to 3mm Max.
Forming Speed
12~14m/Min.
Drive Way
Chain or Gear Box
Delivery Time
30 Days Finished and 10 Days More to Test
Transportation
by Sea or Train
Transport Package
Machine in 40′′gp,Other Accessories in Wooden Case
Production Capacity
10sets/Month
Packaging & Delivery
Package Size
2500.00cm * 1200.00cm * 150.00cm
Package Gross Weight
2000.000kg
Product Description
Machine's Components: | Uncoiler, coil sheet guiding device, film covered device(optional), main roll forming system, cutting device, hydraulic, PLC control table and final product run out table. |
Specification: | -Suitable raw material: color steel sheet; galvanized steel sheet; -Suitable thickness of raw material: 0.3-0.8mm; -Main motor power: 5.5kw(depend on finaldesign); -Hydraulic station power: 2.2kw(depend on final design); -Forming speed: about 15m-20m/min -Uncoiler's loading capacity: 5tons(can be increased to 10 tons or at buyer's requirement); -Control system: Mitsubishi PLC&converter; -Voltage:380V, 3phase, 60HZ, or at buyer's requirement; Machine's dimension: about 8m-1.5m*1.4m(depend on final design); |
Working flow: | Uncoiling the steel coil→ feeding and guiding the steel sheet→ film covering→ main roll forming→ cutting the panel→fianl product run out the table |
Frequently Asked Questions (FAQ)
Q1: When Can I Get The Quotation?
A: We Usually Quote Within 24 Hours After We Get Your Inquiry. If You Are Very Urgent To Get The Price, Please Call Us Or Tell Us In Your Email So That We Will Regard Your Inquiry Priority.
Q2: How Can I Get A Sample To Check Your Quality?
A: After Price Confirmation, If You Need The Samples, We Will Charge For The Sample Cost. But The Sample Cost Can Be Refundable After Order Confirmation When Your Quantity Of The Order Is More About The MOQ.
Q3: Can You Do The Design For Us?
A: Yes. We Have A Professional Team that has Rich Experience In Outdoor Furniture Design And Manufacturing. Just Tell Us Your Ideas And We Will Help To Carry Out Your Ideas Into Perfect Furniture. It Does Not Matter If You Do Not Have Someone To Complete Files. Send Us High-Resolution Images, Your Logo, And Text, And Tell Us How You Would Like To Arrange Them. We Will Send You the Finished Files For Confirmation.
Q4: What About The Lead Time For Mass Production?
A: Honestly, It Depends On The Order Quantity And The Season You Place The Order. The Lead Time Of MOQ Is About 35 To 45 Days. Generally Speaking, We Suggest That You Start Inquiry Two Months Before The Date You Would Like To Get The Products in your Country.
Q5: How Do You Make Our Business Long-Term And Good Relationship?
A:1. We Keep Good Quality And Competitive Price To Ensure Our Customers Benefit ;
2. We Respect Every Customer As Our Friend And We Sincerely Do Business And Make Friends With Them, No Matter Where They Come From.