Basic Info.
Making Method of Parison
Extrusion-Blow Molding
Computerized
Computerized
Certification
CE, ISO9001:2008
Product Name
China PE PVC LDPE PP Sea Ball Blow Molding Machine
Transport Package
Wooden Case
Specification
2800*1800*2000mm
Packaging & Delivery
Package Size
190.00cm * 180.00cm * 190.00cm
Package Gross Weight
3600.000kg
Product Description
Product Parameters
| item | J2 |
Bottle type specification | cavity | 2 |
theoryoutput(PCS/HR) | 1500 |
Max. volume (L) | 5L |
Bottle mouth maximum overall diameter (mm) | 150mm |
Bottle biggest diameter | 180mm |
Bottle maximum height | 400mm |
Power specifications | Light tube quantity | 32pcs |
Light tube power | 1.5kw |
Maximum heating power | 48kw |
All electric machine installation | 51kw |
| actural consumption | 35.7kw |
Air pressure specification | Work pressure | 7-9kg/cm2 |
Low-pressure gas consumption | 1600Ltr/min |
Blow bottle pressure | 25-35kg/cm2 |
Higher -pressure gas consumption | 3400Ltr/min |
Frozen water specification | Work pressure | 5-6 kg/cm2 |
Temperature range | 10 C |
Consumption | 6000kcal/hr |
Frozen water flow | 50Ltr/min |
Machine specification | Size of the machine | 4.7x1.6x1.9 (m) |
Weight of the machine | 3.0ton |
This system is ideal for start-up and small-scale companies and is reliable, heavy duty, and capable of producing a wide variety of high quality P.E.T. bottles for many industries like water,juice, liquid detergent, vegetable oil, cosmetics, personal care items which are just a few examples. Feature: 1.Original air cylinder. 2.Minimize your initial investment by starting small. 3.Add additional systems economically as your business grows. 4.Bottles of different sizes can be produced simultaneously to meet your exact requirements. 5.Change over from one size to another can be completed simply and quickly. 6.The tooling costs (molds) are low since the design of the system is simple. 7.Systems can be dedicated to produce particular bottle sizes. A short operator-training period due to the simplicity of the design. 8.Maintenance costs are kept to a minimum and highly-trained personnel are not required
Related Products
Flow Chart
Drawing & Moulds
Details
Assistant Machine
FAQ
Q: How about the spare parts?
A: We will send Two year easy broken spare parts for free together with machines,shipping together.
Q: How long time for installation?
A: According your machines order , we will send one or two engineers to your plant, it will take about 7 days to 20 days .
Q: How to install my machines when it arrives ? how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pays for air tickets go and back, accommodation and USD50/ day/person.
Q:When can I get my machine after I paid ?
A: The delivery time is around 30-45 working days.
Q:What's your guarantee or the warranty of the quality if we buy your machines ?
A: We offer you high quality machines with 2 year guarantee and supply life-long technical support.
Q:Are you a trading company or a manufactory?
A : We are a manufactory, we supply the factory price with good quality, welcome to visit !