US$5,220.00-12,500.00
|
1 Piece
(MOQ)
|
Basic Info.
Tile Type
Color or Normal or Galvanzied
Transmission Method
Electric or Hydraulic,etc.
Shaft Material
45#Steel with Heat Treatment
Raw Material Thickness
0.3mm-0.8mm
Roller Material
45#Steel with Heat Treatment
Transport Package
Container or Bulk
Specification
8 m*1.3m*1.5m
Product Description
Large span Pressing machine Specification
Item | Unit | Parameter | Remark |
Material | Type | | PPGI, PPGL, GI, GL, PPAL |
Thickness of Material | mm | 0.2-1.0mm |
Weight | kg | 12000 kg |
Material Width | mm | 914-1650 |
Production Speed | m/min | Common speed: 0-5m/min |
High speed: 30-60m/min |
Effective Width of Product | mm | 760-1260mm |
Roller Material | | 45#, Cr12, GCr15, GCr12MoV |
Power | | 220v 60hz 3 phrase or as your request |
Drive Type | | By Chain or Gear or Gearbox |
Motor Power | kW | 5.5-15kW |
Brand of Electric Control System | | Delta or Siemens |
Dimension ( L* W * H ) | m | 8 m*1.3m*1.5m |
Product Details
HOT POPULAR Ag/Tuff Rib Panel 5 rib and PBR/R-Panel 4 rib NEW DOUBLE DECK Roll Former Machine
Popular TR4 TR5 TR6 /PV4 PV5 PV6 PROFILE PANEL ROLL FORMING MACHINE
Application Effect
Packaging & Shipping
After-sales And Warranty
1. Warranty period: 1 year or 2000 working hours 2. Pay attention to the warranty scope 3. If the customer reports a quality problem, the following information must be provided: 1) Please verify the working time of the whole machine (nameplate photo, instrument photo) 2) Make a clear statement or cause analysis of the failure of the component (provide working environment, pictures, videos) 3) Give us feedback as soon as possible FAQ
Q1:1:What is your minimum order quantity?----1unit, customized service is availableQ2:How Long for lead time ?----If the parts are in stock, it is usually delivered within 10 working days. Other customized styles take about 20 working days. It depends on the customer's requirements for the forkliftQ3:How long is your warranty period?---1 year or 2000 working hoursQ4: What payment terms do you accept?---1) T/T 30% in advance as deposit,70% before loading---2) T/T30% as deposit ,40% after inspection forklift ,30% before loading ----3) T/T20% as deposit ,50% after inspection forklift ,30% against BL copyQ5:How about the shipping term ?---1)LCL By Sea---2)20GP/40HQ/45FT---3)By Bulk Cargo