US$55,000.00-65,000.00
|
1 Piece
(MOQ)
|
Basic Info.
Transmission
Mechanical Transmission
Drive Type
Internal Combustion Drive
Bucket Capacity
1.0~1.5m³
Certification
ISO9001: 2000
Applicable Industry
Earthwork
Transport Package
Shipping
Product Description
Product Description
BRAND | SAN Y | TRAVELING SPEED | 5.3/3.2km/h |
MODEL NO. | SY205C | DIMENSION(L*W*H) | 9680*2800*3440mm |
Made year | 2021 | MAXIMUM DIGGING RADIUS | 10280mm |
HOURS OF USE | 3105H | | 9600mm |
DRIVE TYPE | Internal Combustion Drive | MAXIMUM DIGGING DEPTH | 6600mm |
Transport Package | SHIPPING | CONDITION | USED |
MAXIMUM ENGINE POWER | 118/2000Kw/Rpm | BUCKET CAPACITY(m³) | 0.9~1.1(1.0)m3 |
HS Code | 8429521100 | Climbing ability (%) | 70% |
Detailed Photos
Company overview
common problem
Q: WHAT IS YOUR ADVANTAGES? A: Abundant supply of high quality used machinery
Professional refitting and maintenance Service
Comprehensive performance test with actual condition
Professional team with rich export experience
Q:What are your main export construction machineries?
A: Used concrete mixer truck,Used trailer concrete pump,Used concrete line pump,Used Truck mounted concrete pump,Concrete batching plant,u sed cranes,used excavators,used road machinery, used piling machinery a nd so on. Ranging second-hand original machineries to refurbished mach ineries .
Q: WHICH PAYMENT TERMS CAN YOU ACCEPT?
A: Normally we can work on T/T term or L/C term
Q: HOW IS YOUR DELIVERY TIME?
A: After the equipment has been tested to ensure that the product is qual ified, the delivery will be carried out.The shipping time is then estimated to be 15-45 days,depending on destination.
Q: What is the minimum order quantity for your used machinery?
A:The MOQ is 1 unit.
Q: How do I know the condition of the original used or re-manufacturing concrete pump truck?
A:We will provide a video of the specifications and the test of the pump truck before we ship to you.
Q: HOW SOON CAN YOU RESPOND CLIENT INQUIRIES?
A: Our team is professional working 24*7 to respond client inquiries in time. Most problems can be solved within 6 hours.