Product Details
Product Description
Product Description
Focus on DCS, PLC, robot control system and large servo system.
Main products: various modules / cards, controllers, touch screens, servo drivers.
Advantages: supply of imported original products, professional production parts,
Fast delivery, accurate delivery time,
The main brands include ABB Bailey, Ge / fuanc, Foxboro, Invensys Triconex, Bently, A-B Rockwell, Emerson, ovation, Motorola, xyvom, Honeywell, Rexroth, KUKA, Ni, Deif, Yokogawa, Woodward, Ryan, Schneider, Yaskawa, Moog, prosoft and other brands
Observe that the power CPU LED (not shown), located on the front panel. During the initialization, the CPU LED will start by illuminating solid amber, then start blinking green, then blinking amber, then blinking green again until the end of the initialization, and then turns solid green. If the switch is a standalone switch, it will take approximately 30 seconds for the switch to start up. If the switch is a stack manager, it can take up to 3 minutes or more to initialize all the switches in the stack, depending on the number of member switches in the stack. Installing and Connecting a Redundant Power System You can use the STK‐RPS‐150PS, a 150W redundant power supply for A4 models. STK-RPS-150PS The STK‐RPS‐150PS can be used as a standalone unit, or you can install an STK‐RPS‐150PS in the following RPS shelves: 1 AC power cord 2 AC power connector 3 Redundant power supply connector Note: If the CPU LED illuminates solid red, there was a critical failure. For more information about the LED indications and troubleshooting, refer to Chapter 3, Troubleshooting. If you need additional help, contact Enterasys Networks. Refer to “Getting Help” on page xvii for details. Note: The STK-RPS-150PS is a replacement for the C2RPS-PSM. If you already have a C2RPS-PSM power supply, it can be used in place of the STK-RPS-150PS. Installing and Connecting a Redundant Power System Enterasys A4 Fast Ethernet Switch Hardware Installation Guide 2-11 • STK‐RPS‐150CH2, a two‐slot chassis • STK‐RPS‐150CH8, an eight‐slot chassis Required Tools A flat‐blade screwdriver is required to install the STK‐RPS‐150CH2 or STK‐RPS‐150CH8 shelf and STK‐RPS‐150PS power supplies. Unpacking the Shelf and Power Supply The shelf and the power supply are shipped separately. To unpack these devices proceed as follows: 1. Open the box and remove the packing material protecting the shelf or power supply. 2. Verify the contents of each carton and compare the contents shipped with those listed in Table 2‐1, Table 2‐2, and Table 2‐3. 3. Perform a visual inspection of the components for any signs of physical damage. Contact Enterasys Networks if there are any signs of damage. Refer to “Getting Help” on page xvii for details. Installing an STK-RPS-150PS Into a Shelf If you are using the STK‐RPS‐150PS as a standalone unit, go to “Connecting the RPS Cable and AC Power Cord” on page 2‐16. Note: The STK-RPS-150PS can also be installed in the old two-slot and eight-slot chassis, C2RPS-CHAS2 and C2RPS-CHAS8. Table 2-1 Contents of STK-RPS-150CH2 Carton Item Quantity STK-RPS-150CH2 1 Quick Reference 1 Table 2-2 Contents of STK-RPS-150CH8 Carton Item Quantity STK-RPS-150CH8 1 Quick Reference 1 Table 2-3 Contents of STK-RPS-150PS Carton Item Quantity STK-RPS-150PS 150 watt DC power supply 1 USA, NEMA power cord 1 RPS cable 1 Notice card