Basic Info.
Computerized
Computerized
PP Film Washing Machine
PE Film Washing Line
advanced design
steady operation
full automatic
low energy consumption
Production Capacity
500kg/H
Product Description
Product Description
PE/PP Film Washing and Recycling Granulating Line, PP/PE film washing line, recycling machinery, plastic recycling line
Features and Application:
1. For the film characteristic, combined with foreign advanced technology, we developed the high-yielding film washing production line. The equipment construction is compact and reasonable.
2. Used for PP, PE, PET film, bottle, block, bag and so on.
3, This machine is used to treat plastic film material, just like PE, PP film, PP woven bags and so on.
4, It can crush, wash, and dry the material, finally you will get clean, dry flakes, which can be used to
Make granules directly. Our capacity is from 300kg/h to 1500kg/h.
5, With the friction washer and floating washer, the dirt on the material will sink into the water;
With 1200rpm high speed rotating, the high speed friction washer is able to clean the oil on the film,
And steam washer will heat the water, to make the material cleaned perfectly.
6, Our dewatering machine is designed by Germany, more effecient than others, and with the heater and heating pipe, the moisture of final products will be less than 2 per cent.
Installation Instructions
PP PE film washing machine work condition:
1 | Model | 300~1500kg/h |
2 | Production line dimension(MM) | 28000×6000×3500 (L×W×H) |
3 | Total installation power | 150-250KW |
4 | Power consumption | 100KW-165KW |
5 | Total weight | Around 15000-16000kgs |
6 | Water consumption | 2-5M3/H |
7 | Manpower required | It need 4 persons every batch when the machine running |
Company Profile
After Sales Service
1. One year guarantee for whole machine2.24 hours technical support3. Our engineers can provide service overseas. The service is free, but the charge of round air-tickets, food and hotel is to the customer's account.4. After a year, we can instruct you how to maintain the machine, and spare parts are provided with the best price.5. We also can provide training service which help operators handle the machine well.
FAQ
1. Q:As the shipping period will take long time, how can you make sure the machine won't be broken?
A: Our machine is film wrapped, to make sure the machine can be delivered to our customer smoothly, we will use the steel wire to fix the machine with the container.
2.How about your supply ability of your factory?About 100 productions per year.3.Do you have any technical supports?We have a magnificent research term and development term for new project and a professional technical term for installation anddebugging.4.Are you have competitive price in the world market ?We account our cost accurately to make sure quality is higher than price.5.How do you ensure us quality ?We have a quality supervision department who are responsible for tracking and monitoring for whole production process. We willtest every machine after finished before delivery. optional choose by client running the machinery by material.