Product Description
Product Description
Product DescriptionAT225 Laboratory Melt Spinning Machine is a main key equipment in synthetic fiber production. This machine uses high temperature copper ring block to heat and melt the polymer sample, and extrudes the sample to be liquid trickle from a spinneret under the effect of inert gas (N2) pressure to produce the nascent fiber. SpecificationModelAT225Pressure rangeMax. 2MPa (can extend to 3.6Mpa)Input pressure: ≤13MPa, Output pressure: ≤1.5MPaaccuracy: ±0.01MPaTemperature rangeMax. 350℃Temperature accuracy±0.5℃Heating modeThree heating sections with copper ring block to heatMullite fiber insulationTemperature control modeThree independent temperature controlling with the accuracy of ±0.5℃Feed cylinder500ml, stainless steel, with soaking distribution deviceSpinneret plateDia. 0.15~0.5mmL: D: 2:1~3:1 1~20 spinneret holes (please specify before order)Winding systemWinding roller drive modeMotor-drivenSpeed range0~1400rpm, adjustableWinding roller diameter¢200mm, can be customizedMax. Winding dia.¢320mm (including ¢200mm winding roller)Power supplyAC220V, 50HzDimensions870mm×1310mm×1860mm (D×W×H)WeightsApprox. 320kgDetails★ It consists of melting system, spinning system and winding system; ★ Stable inert gas pressure system (gas source should be prepared by the user himself);★ Metal protective hood with air leg; ★ Colorful touch screen, real-time display of temperature and air pressure in cylinder; ★ Be able to independently set and control the temperature of each heating zone;★ Three heating zones with copper ring block to heat; ★ Insulation plate under the feed cylinder to block the spinneret hole for rapid heating;★ Max temperature up to 350℃;★ Cooling fan with adjustable speed;★ Dischargeable winding drum with adjustable rotation speed;★ Hand wheel to adjust the position of winding drum;★ Organic glass window and illumination system, convenient to observe; ★ With illumination system★ With emergency stop and heat on/off button; Our CompanyHistorySince 1982 with more than 20 years’ experienceWarrantyTwo Year Warranty for whole productTrainingVideo and user manual for trainingOnsite serviceInstallation and training service is availableTesting serviceFree sample testing before order is availableLead time15 working days lead time for most productPacking & DeliveryPackagingPackaging Details1. The equipment is covered with film is protect it from water vapour during the trip. 2. The box is filled with foam to protect the equipment from impact. 3. Exported wooden box made from plywood, don't need fumigated. PaymentPayment TermT/TEXW30% T/T in advance, paid the balance before shipmentFOBCFR(C&F)30% T/T in advance, paid the balance against copy of B/LCIFL/CL/C amount above 50,000 usd, we can accept L/C at sightWest UnionAmount lower than 5000usdWest UnionDelivery Time7~10days after receiving payment for one containerContacting Us