Basic Info.
Product Line
PP Woven Bag Cutting and Sewing Production Line
Sealing & Cutting
Heat-Cutting
Machine Type
Cutting and Sewing Machine
Computerized
Computerized
Type
Plastic Bag Making Machine
Max. Diameter of Unwinding Roll
1200mm
Max. Cutting Length
1300mm
Production Speed
60PCS/Min
Gross Weight
About 2000kg
Outling Size
6000*6000*1500mm
Transport Package
Wooden Case
Production Capacity
300 Set Per Month
Packaging & Delivery
Package Size
380.00cm * 158.00cm * 242.00cm
Package Gross Weight
1950.000kg
Product Description
Product Description
Main Technical Parameters:
Model | KWY-800 |
Max. Diameter of unwinding roll | 1200mm |
Max. Cutting width | 750mm |
Max. Cutting length | 1300mm |
Cutting precision | +-1 |
Folding width | 20-30mm |
Production speed | 60PCS/min |
Power | 6kw |
Weight | About 2500kgs |
Outling size | 6000*6000*1500mm |
Peformance And Characteristics:
1. Automatic heat cutting and bottom sewing for the printing bag and blank bag to save the labor.
2. Touch screen, PLC, Servo motor to control the length of bag precisely.
3. The month of the bag is easy open after heating cutting.
4. Auto counting, integrated feeding.
5. Pneumatic rolling up, convenient operation.
08. ELECTRONIC SYSTEM: Machine Electronic Components & Motors Are From International Famous Brand
Our Workshop
Packing & Delivery
Our Service
Warranty
* 1 year warranty
* Any part of electronic ,if it's not cause by man-made reasons,we will ship you a free new one.
* If beyond warranty,we offer free repair service,Clients need undertake ship cost
After-Sales Service
* Training how to instal the machine, training how to use the machine.
Engineers available to offer service overseas.but client please undertake travelling expenses for them.
FAQ Q: Are you trading company or manufacturer ? A: We are factory which have export right. We have exported our machine to so many countries like Pakistan,Malaysia Indonesia,Philippines,Egypt,Turkey,Russia,Ukraine,Serbia,Moldova&Colombia. Q: How long is your delivery time? A: Generally it is 10-15 days after getting deposit.
Q: What is your terms of payment ? A: Usually 30% T/T in advance ,balance before delivery.