US$7,500.00-8,000.00
|
1 Piece
(MOQ)
|
Basic Info.
Required Paper
Single Side PE Coated Paper
Logo Printing
Without Logo Printing
Model
Mg-Q12 Paper Cup Froming Machine
Syetem
Open Cam or Gearbox
Paper Material
Single PE Coated Paper
Payment
30% Deposit 70% Balance Befor Shipping
Transport Package
Wooden Case
Specification
2600x1200x1650mm
Trademark
mingguo machinery
Production Capacity
22000PCS/Day(8hours)
Product Description
MG-Q12 Paper Cup Machine
Machine video link:
https://mingguomachinery.en.made-in-china.com
https://mingguomachinery.en.made-in-china.com
https://mingguomachinery.en.made-in-china.com
MACHINE INTRODUCTION
MG-Q12 This type of paper cup forming machinery is a multi-station automatic cup making equipment. Installed with photoelectric sensor, fault detecting device, high-precision counter and other instruments, this paper converting instrument is frequently asked for production and manufacture of a comprehensive range of drink cups. The paper cup maker fulfills a number of complex procedures and is noted for easy operation, stable properties, little occupied area and high production.
TECHNICAL SPECIFICATION
Model | MG-Q12 |
Paper cups specifications | 2-12 oz(50ml-350ml) (mold exchangeable) T:50-105mm H:50-120mm B:35-125mm |
Production capacity | 45-55pcs/min |
Paper specification | 150-350g single PE coated paper |
Voltage | 220V/380V |
Power | 3.5KW |
Net weight | 1500Kg |
Dimensions | 2800mm×1400mm×1700mm |
Note | Customized service is available |
AFTER SERVICES
A. One year warranty. (Non-artificial damage of parts we will send to customer, customer need pay for the transport cost.)
B.First time, when machine delivery, if customer need, then we will send the engineer to
customer country install the machine and adjust the machine for customer( customer
need pay the return tickets cost, hotel cost, visa cost, engineer salary 100usd/one day(include on the plane days)).
C.The details depend on contract or proforma invoice.
PAYMENT DETAILS
Payment term:30% deposit pay before produce, the left 70% arrange before the loading.
DELIVERY TIME
40 days after got the 30% deposit by TT.
CERTIFICATE