US$15.90-19.90
|
500 Pieces
(MOQ)
|
Basic Info.
Usage
Construction, Tools, Industrial, Storage
Wheel Type
Pneumatic Wheel
Surface Treatment
Galvanized or Painted
Tyre Type
Solid Wheel or Pneumatic Wheel
Tyre Metarial
Rubber Wheel or PU Foam Wheel
Quantity Per 40′hq
2000PCS
Transport Package
in Bulk
Origin
Qingdao, Shandong, China
Production Capacity
200000
Packaging & Delivery
Package Size
153.00cm * 58.00cm * 67.00cm
Package Gross Weight
15.000kg
Product Description
Product Parameters
90L Heavy Duty Construction and Garden Tool Metal Wheel barrow
Specification
1)Wheel Barrow Load: 200kg
2)Wheel Barrow Water Capacity:90L
3)Wheel Barrow Sand Capacity:6CBF
4)Wheel Barrow Wheel Material: Rubber Wheel and PU Wheel
5) Wheel Barrow Wheel Type:Solid Wheel or Pneumatic Wheel
6) Wheel Barrow Wheel Size:According to capacity and customers request
7)Wheel Barrow Surface Treatment:Galvanized or Painted
8)Wheel Barrow Packing: in bulk
9)Wheel Barrow Color:According to customers' requests
Packaging & Shipping
Packing & Shipping
Sea Port | Qingdao |
Products Capacity | 200000pieces/year |
Delivery Date | within 25 working days |
Packaging | In Bulk, Woven bags or plastic package, Cartons or Pallet |
Company Profile
QINGDAO HONGYU TOOLS CO.,LTD is located in Huangdao (formerly Jiaonan) Qingdao Lingang Industrial Park, our company specializes in the production and design of trolleys, warehouse trucks, tools, vehicles and other logistics special vehicles up to 10 years, and there are special requirements of the products provide customers with products tailored service as much as possible to meet customer demand.
Why Choose Us? 1) Providing our clients with professional services2) Quality warranty 3) Timely delivery4) Have our own brand, and also we do OEM and make with our client brand.5) First level equipments with united working team, various products mould can supply many models as you need.6) We own an advanced production line which are operated by experienced workers,and the packing department has very strict roles.7) We can provide you products with high quality and competitive price.
We are the direct factory located in Jiaonan City!!!Sincerely hope we could establish a long-term business relationship with you.
FAQ Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 15-20 working days if the materials are in stock. or it is 25-30 working days if the materials are not in
stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.